{"id":92,"date":"2015-01-12T10:24:56","date_gmt":"2015-01-12T09:24:56","guid":{"rendered":"http:\/\/www.pierre-vincent.com\/memosap\/?p=92"},"modified":"2015-01-12T10:24:56","modified_gmt":"2015-01-12T09:24:56","slug":"account-assignment-of-production-order","status":"publish","type":"post","link":"http:\/\/www.pierre-vincent.com\/memosap\/2015\/01\/12\/account-assignment-of-production-order\/","title":{"rendered":"Account Assignment Of Production Order"},"content":{"rendered":"<table width=\"100%\">\n<tbody>\n<tr>\n<td><center><b><span style=\"color: #cc0000;\"><span style=\"font-size: small;\">Account Assignment Of Production Order<\/span><\/span><\/b><\/center><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td><i>Where does the account assignment of the planned orders get generated from?<\/i><br \/>\n<i>\u00a0<\/i><br \/>\n<i>In our case, we have a make to order scenario-20, where by default, the account assignment for planned orders is \u00ab\u00a0E\u00a0\u00bb. i.e. sales order.<\/i>&#8212;Normally this account assignment flows from Account assignment category defined in the Requirement Class. This Requirement class then assigned to Requirement type. This Requirement type is assigned to Strategy and this Strategy assigned Strategy group. Finally this strategy group is then linked to your material master.<\/p>\n<p>For your case, I think this is coming from the <b><span style=\"color: #000099;\">Strategy Group 20<\/span><\/b>.Check this by the following path:<\/p>\n<p>1. Check the strategy assigned to strategy group 20 in T code <b><span style=\"color: #990000;\">OPPT<\/span><\/b> or by path IMG -&gt; Production -&gt; Production Planning -&gt; Demand Management -&gt; Planned Independent Requirements -&gt;<a href=\"http:\/\/www.erpgreat.com\/production\/planning-strategy-selection.htm\" target=\"_top\" rel=\"noopener\">Planning Strategy<\/a> -&gt; Define Strategy Group.<\/p>\n<p>2. Then check which Requirement type is assigned to that Strategy in T Code <b><span style=\"color: #990000;\">OPPS<\/span><\/b> or by path IMG -&gt; Production -&gt; Production Planning -&gt; Demand Management -&gt; Planned Independent Requirements -&gt; Planning Strategy -&gt; Define Strategy.<\/p>\n<p>3. Now if this strategy you are using is 20 that is Make to order, then you will find settings for those Requirement type in Sales. For that you can take help from your SD consultant. Also providing you path for the same as below.<\/p>\n<p>4. Check the assignment of Requirement class to requirement type in T Code <b><span style=\"color: #990000;\">OVZH<\/span><\/b> or by path IMG -&gt; Sales and Distribution -&gt; Basic Functions -&gt; Availability Check and Transfer of Requirements -&gt; Transfer of Requirements -&gt; Define Requirements Types.<\/p>\n<p>5. At the end you have to check the settings and assignment of &lsquo;Account Assignment Category&rsquo; for your Requirement Class in T Code <b><span style=\"color: #990000;\">OVZG<\/span><\/b> or by path IMG -&gt; Sales and Distribution -&gt; Basic Functions -&gt; Availability Check and Transfer of Requirements -&gt; Transfer of Requirements -&gt; Define Requirements Class.<\/p>\n<p>6. Here check the &lsquo;Account Assignment Category&rsquo; under &lsquo;Account Assignment&rsquo; tab.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.erpgreat.com\/production\/requirement-class.jpg\" alt=\"Requirement Class in T-code OVZG\" width=\"469\" height=\"605\" \/><\/p>\n<p>Note:<\/p>\n<p>Also, check the settings of Individual\/coll. in <a href=\"http:\/\/www.erpgreat.com\/production\/how-mrp-type-in-mm-mrp-view-1-works.htm\" target=\"_top\" rel=\"noopener\">MRP4 view<\/a> for Semi-FG and Raw material in Material master.<\/p>\n<p>Normally according to standard settings, it will be blank and you keep it as blank then it will take &lsquo;<a href=\"http:\/\/www.erpgreat.com\/production\/individual-collective-requirement-indicator.htm\" target=\"_top\" rel=\"noopener\">Individual and collective requirements<\/a>&lsquo; which means it will take FG&rsquo;s requirement. If You keep it as &lsquo;1-Individual requirements only&rsquo; then it will take Individual requirement every time means it will be \u00ab\u00a0E\u00a0\u00bb for every requirement if your FG has \u00ab\u00a0E\u00a0\u00bb. And if you don&rsquo;t want to follow the FG&rsquo;s requirement plan then you have to keep it as &lsquo;<b><span style=\"color: #000099;\">2-Collective requirements only<\/span><\/b>&lsquo;.<\/td>\n<td valign=\"TOP\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td><b>See also<\/b><br \/>\n<a href=\"http:\/\/www.erpgreat.com\/production\/production-order-external-operation-processing.htm\" target=\"_top\" rel=\"noopener\">Production Order External Operation Processing<\/a><b>Get help for your SAP PP Problems<\/b><br \/>\n<a href=\"http:\/\/www.erpgreat.com\/production\/pp-question.htm\" target=\"_top\" rel=\"noopener\">SAP PP Forum<\/a> &#8211; Do you have a SAP PP Question?<b>SAP Production Planning Books<\/b><br \/>\n<a href=\"http:\/\/www.erpgreat.com\/sap-books.htm#SAP-PP\" target=\"_blank\" rel=\"noopener\">SAP PP Certification, Interview Questions and Configuration Books<\/a><\/p>\n<p><b>SAP PP Tips<\/b><br \/>\n<a href=\"http:\/\/www.erpgreat.com\/sap-pp.htm\" target=\"_top\" rel=\"noopener\">SAP PP Tips and Production Planning\/Control Discussion Forum<\/a><\/p>\n<p><b>Main Index<\/b><br \/>\n<b><a href=\"http:\/\/www.erpgreat.com\/index.htm\" target=\"_top\" rel=\"noopener\">SAP Basis, ABAP Programming and Other IMG Stuff<\/a><\/b><\/p>\n<p><center>All the site contents are Copyright \u00a9 www.erpgreat.com and the content authors.<\/center>&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Account Assignment Of Production Order Where does the account assignment of the planned orders get generated from? \u00a0 In our case, we have a make to order scenario-20, where by default, the account assignment for planned orders is \u00ab\u00a0E\u00a0\u00bb. i.e. &hellip; <a href=\"http:\/\/www.pierre-vincent.com\/memosap\/2015\/01\/12\/account-assignment-of-production-order\/\">Continuer la lecture <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-92","post","type-post","status-publish","format-standard","hentry","category-prod-planning"],"_links":{"self":[{"href":"http:\/\/www.pierre-vincent.com\/memosap\/wp-json\/wp\/v2\/posts\/92","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.pierre-vincent.com\/memosap\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.pierre-vincent.com\/memosap\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.pierre-vincent.com\/memosap\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.pierre-vincent.com\/memosap\/wp-json\/wp\/v2\/comments?post=92"}],"version-history":[{"count":0,"href":"http:\/\/www.pierre-vincent.com\/memosap\/wp-json\/wp\/v2\/posts\/92\/revisions"}],"wp:attachment":[{"href":"http:\/\/www.pierre-vincent.com\/memosap\/wp-json\/wp\/v2\/media?parent=92"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.pierre-vincent.com\/memosap\/wp-json\/wp\/v2\/categories?post=92"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.pierre-vincent.com\/memosap\/wp-json\/wp\/v2\/tags?post=92"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}